7. Enclosure Installation(Alternative Mounting Arrangements → Optimised Temperature Control → Mechanical Damage Protection → Enclosure Entries And Water Exposure)
8. Maintenance(Check: → Thermostat Operation Correct. → Thermostat Set To Suit Application. → Lid Closed Firmly. → Mounting Is Firm. → Exposed Capillary Is Not Damaged.)
9. Bulb And Capillary Installation(Location Of Bulb → Sensor-montage → Instalação Do Bulbo E Do Capilar → Montage De La Sonde → Positionnement De La Sonde)
10. Dimensions In Mm(Bulb And Capillary Installation → Attachment Of Bulb → Fix To Pipe With Tape Where Appropriate)
12. Cable Connections Continued(Check: Gland Seal (grommet) Is In Place. Gland Body And Nuts Are Tightened Firmly. → Ensure Lid Retaining Grub Screw Remains Clear Of Lid → Close Lid By Hand → Tighten Lid Retaining Grub Screw → Where Required Connect External Earth Terminal Provided)
13. Установочный Винт, Который Крепит Крышку, Должен Не Затрагивать Крышку.(Закройте Крышку Вручную. → Затяните Установочный Винт, Который Крепит Крышку. → Если Необходимо, Подсоедините Внешнюю Клемму Заземления, Которая Входит В Комплект Поставки. → Установочный Винт, Который Крепит Крышку, Должен Быть Полностью Затянут, Чтобы Соответствовать Требованиям Монтажа Во Взрывоопасной Зоне. → Certifique-se De Que O Parafuso De Retenção Sem Cabeça Seja Apertado Totalmente Para Satisfazer Os Requisitos De Aprovação Para Área Perigosa. → As Conexões Do Cabo São Contínuas.)
14. Complete Installation(Ensure The Pipe And Bulb Are Thermally Insulated And Clad To The Design Specification After Installation Of Thermostat. → Test As Described In The Installation & Maintenance Manual. → Retain This Instruction For Future Use.)
15. Setting(Loosen Fixing Bolts And Remove Cover From Dial. → Adjust Knob To Required Setting. → Replace Cover Firmly By Tightening Fixing Bolts.)
16. Thermostat(Area Of Use → Approval Certification → Enclosure → Temperature Sensing → Switching → Accessories)