Home > GOLDAIR > Goldair GEPH213 EcoPanel Heater with Thermostat Instruction Manual

Goldair GEPH213 EcoPanel Heater with Thermostat Instruction Manual

Wall Mounting & Position Instructions cont.  
Orientation.  
The heater must be mounted on the wall with the power switch in the top right hand  
position as shown below.  
Note: Do not run power  
cord behind the heater.  
THIS  
WAY UP  
NOTE: Your Goldair EcoPanel Heater should be installed with at least 300mm clearance from the floor  
and any other surrounding parts including other appliances, side walls, ceilings, shelves and soft  
furnishings.  
1. Mark the positions of the four holes to be  
drilled on the wall. Ensure there is a 300mm  
clearance on all sides of the heater.  
4. Install the panel heater onto the four rail fittings  
matching the four holes on the heater.  
5. Screw the four screw bolts into the plastic rail  
fittings.  
6. Put the caps onto the end of the screw bolts. It is  
recommended to use some normal glue to stick  
the caps onto the bolts steadily.  
2. Drill holes with an appropriate drill bit for the  
wall surface you are mounting the heater on  
to.  
3. Insert the plastic rail fittings into the holes.  
To remove the unit from the wall, simply remove the bolt caps, unscrew the bolts with a screw driver and take  
the heater down.  
GeneralDetails
NameGoldair GEPH213 EcoPanel Heater with Thermostat Instruction Manual
MakeGOLDAIR
LanguageEnglish
FiletypePDF (Download)
File size0.19 MB
Download PDF
1 Star2 Stars3 Stars4 Stars5 Stars (1 votes, average: 5.00 out of 5)
Loading...

Goldair GEPH213 EcoPanel Heater with Thermostat Instruction Manual